FIRST SOLAR

Project Overview/Challenge

First Solar, a leading industrial manufacturing company, invested in building a plant spanning an impressive 2.4 million square feet that required a comprehensive Building Automation System (BAS) to manage its critical infrastructure, including a 15,000-ton chilled water plant. The project demanded a rapid deployment within a challenging 14-month timeline, highlighting the need for efficient engineering, programming, and installation.

Solution Implemented

The facility implemented the Automated Logic WebCTRL® building automation system to provide full control over its extensive chilled water plant and other vital building systems. This IP-based system manages a wide range of equipment, including a 15,000-ton chilled water plant, rooftop units (RTUs), heat exchangers, VAVs, fan coils, and more. This large-scale, turnkey BAS project encompassed a wide range of integrations, ensuring seamless operation and optimized performance across the entire manufacturing environment.

The integrated solution also includes:

  • (1) 15,000 Ton Chilled Water Plant w/ 5 3,000-ton Chillers in Parallel, 5 Multi-cell Cooling Towers, Make-up Water Reclaim System, 30 Pumps, 8 Heat Exchangers, and Fully Monitored Water Filtration System fully under IP based OptiFlex Controls.
  • OptiFlex Integration to (5) Water Cooled Air Compressors Serving Process Machines – Those machines are:
  • (152) Rooftop Units w/ Full ALC Controls
  • Systems Involved:
    • Emergency Power System Integration: (4) Gen Sets + (9) ATS + (4) UPS
    • Lighting System BACnet Integration
    • Process Utility Monitoring to All Machine Drops: Pressure, Temperature and Gas Flow 100+ Sensors
    • Office + Cafeteria Controls Including (41) VAV boxes, (2) VAV AHUs, (2) Kitchen MAUs
    • LEL Monitoring and Exhaust Management for sensitive areas
    • Fan Coil and Split Systems Control for Reliability Lab Space
The Outcome

This project stands as a testament to the power of advanced building automation in large-scale industrial settings. By leveraging the WebCTRL® system, First Solar's manufacturing facility achieved a fully integrated and highly efficient operational environment, setting a new standard for industrial BAS implementation. This success not only optimized the facility's performance but also solidified a long-term partnership for future projects.

first-solar-manufacturing-facility-16x9
Client: First Solar
Location: Trinity, AL
Branch/Dealer: ALC Great Lakes & Gulf States Automation
Date Installed: Completed Sept. 2024
Key Highlights & Achievements: Rapid Deployment: The complex BAS project was completed in just 14 months, demonstrating exceptional project management and execution capabilities.
Comprehensive Control: The WebCTRL® system provides centralized and integrated control over a vast array of HVAC and critical plant equipment, enhancing operational efficiency and reliability.
Scalable Success: The successful delivery of this large-scale industrial BAS project led to the direct award of a subsequent turnkey BMS project for another major manufacturing facility, underscoring First Solar's confidence and the system's replicability.